Parcel Search: 138142790
Parcel Search
Parcel Attributes
| Parcel | 138142790 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Airport Environs Zone | Tucson International AEZ Paddle |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Sunnyside |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 10/21/2026 9:11 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 10/21/2026 9:11 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000009764 | Closed | N/A |
Permits
Parcel Number - 138142790
Date - 10/21/2026 9:11 a.m.
Total Number Of Permits - (7)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T01CM02650 | Final | 06/01/2001 | 05/25/2003 | COMBO | REMODEL:SOUND MITIGATION PROGRAM | |
| T19CM03243 | Expired | 05/07/2019 | 11/03/2019 | COMBO | ELECTRICAL UPGRADE N0 MORE THAN 200AMP | |
| T19CM03830 | Withdrwn | 05/30/2019 | 12/02/2019 | COMBO | INSTALL PV SYSTEM AND RELATED MATERIALS | |
| T19CM04635 | Final | 06/27/2019 | 03/21/2020 | COMBO | E-INSTALL PV SYSTEM AND RELATED MATERIALS | |
| T19RW05087 | Final | 09/11/2019 | 10/11/2019 | ROW | (2) 5X5 bellholes in dirt alley -- to repair/replace gas line COYL project--NPL crews NOTE: Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. | |
| T20RW05546 | Final | 10/09/2020 | 11/11/2020 | ROW | (2) 5X5 bell holes in dirt alley-- to repair/replace gas line ISSAP GRID Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. | |
| T99CM05019 | Withdrwn | 10/26/1999 | 09/23/2000 | COMBO | REMODEL:TAA PROJECT |