Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel138040480
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Tucson WardWard 1
Tucson Registered NeighborhoodElvira
Major Street & Route

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 11/25/2026 10:58 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 138040480
Date - 11/25/2026 10:58 a.m.
Total Number Of Permits - (43)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-SOL-0425-00548 Complete 04/25/2025 11/10/2025 Solar Solarapp - Installation of 5.74kW PV System
TC-RES-0826-04797 Complete 08/27/2026 10/19/2027 Residential Building - One or Two Family Hunter Contracting will be using 1" White Aquapex for the new waterline service installation. Hunter will utilize 12ga Blue tracer lin. Hunter Plans to install the water service at a depth of 12-18 inches.
TC-RES-1023-08881 Withdrawn 10/17/2023 04/30/2024 Residential Building - One or Two Family Installation of a new 7.200KW photovoltaic solar system - 18 Mods - 1 Inverter
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
T17CM05492 Final 07/19/2017 01/17/2018 COMBO REPAIR/REPL GAS LINE
T17CM07859 Final 10/18/2017 05/20/2018 COMBO UPGRADE UP TO 200AMP