Parcel Search: 115210610
Parcel Search
Parcel Attributes
| Parcel | 115210610 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Brichta |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 11/26/2026 11:05 p.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 115210610
Date - 11/26/2026 11:05 p.m.
Total Number Of Permits - (6)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-0124-00187 | Complete | 01/11/2024 | 07/30/2024 | Residential Building - One or Two Family | Roof mount 6.97 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on 200A bus with 200A MCB | |
| TC-RES-0123-02123 | Withdrawn | 01/16/2023 | 07/15/2023 | Residential Building - One or Two Family | INSTALL NEW GAS LINE TO FURNACE AND WATER HEATER | |
| TC-RES-0123-02223 | Issued | 01/18/2023 | 07/19/2023 | Residential Building - One or Two Family | Gas reconnect gas line | |
| TC-RES-0323-03767 | Withdrawn | 03/22/2023 | 09/18/2023 | Residential Building - One or Two Family | • SYSTEM SIZE: 7400W DC, 5800W AC • MODULES: (20) MISSION SOLAR ENERGY LLC: TXI6-370120BB • INVERTERS: (20) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: ULTRA RAIL, ATTACHMENT DETAIL, OMNIBASE WITH STANDOFF TO RAFTER: SNR-DC-01249 | |
| TC-RES-1223-10013 | Void | 12/11/2023 | 06/08/2024 | Residential Building - One or Two Family | "Void - Duplicate/Same scope of work as existing application permit number #TC-RES-0323-03767. Please resubmit under existing permit or withdraw existing permit before moving forward with a new application. Step-by-Step instructions on how to resubmit: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf " Roof mount 6.97 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV Combiner Box, 40A PV breaker on 200A bus with 200A MCB | |
| T03EL00454 | Final | 03/12/2003 | 09/14/2003 | ELECT | UPGRADE:ELECTRIC 100AMP TO 200AMP (APA) |