Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel101234830
JurisdictionTucson, Pima County
City of Tucson ZoningR-3
Tucson WardWard 3
Tucson Registered NeighborhoodFlowing Wells
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 11/27/2026 5:11 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-97-00 I-10 / Rillito 8795 02/26/1997 8867

Permits

Parcel Number - 101234830
Date - 11/27/2026 5:11 p.m.
Total Number Of Permits - (3)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-RES-1024-06195 Withdrawn 10/24/2024 04/22/2025 Residential Building - One or Two Family Installation of a 11.50 kW-AC pv system
TC-SOL-1124-00786 Complete 11/27/2024 08/25/2025 Solar Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. Installation of a powerwall 3 11.5 AC KW + battery storage
T98CM05285 Final 11/25/1998 08/28/1999 COMBO SFR:TD#12-81-21