Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 

Permits

Parcel Number - 12310001G
Date - 12/04/2024 7:24 p.m.
Total Number Of Permits - (2)
Permit Permit Status Entered Date Expired Date Unit Type Description
T17BU00336 Final 07/24/2017 12/18/2018 DEMO DEMO BLDG
T17BU00349 Final 07/24/2017 12/18/2018 DEMO DEMO BLDG

Plans

Parcel Number - 12310001G
Date - 12/04/2024 7:24 p.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
T17PI00030 Final 05/30/2017 02/09/2021 PAVING & SEWER BANNER UMC EXPANSION Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan U-2017-007 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction.