Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 117061160
Parcel Search
Special Development Requests & Requirements
Date - 11/22/2024 10:41 a.m.
Total Number Of Special Development Permits - (2)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
T12SA00026 | Complete | N/A | |||
T12SA00091 | Applied | N/A |
Permits
Parcel Number - 117061160
Date - 11/22/2024 10:41 a.m.
Total Number Of Permits - (2)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T12BU00606 | Final | 05/10/2012 | 01/29/2013 | DEMO | DEMO OF EXISTING STRUCTURES | |
T12OT00737 | Final | 05/10/2012 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT DEMO OF EXISTING STRUCTURES |
Plans
Parcel Number - 117061160
Date - 11/22/2024 10:41 a.m.
Total Number Of Plans - 2
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T12PI00011 | Final | 05/25/2012 | 08/09/2014 | OTHER | The Junction at Iron Horse Storm Drain Improvements For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved Plan No. D-2012-003 (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to the start of roadway subgrade preparation work. THIS PERMIT MUST BE RENEWED EVERY 180 DAYS TO REMAIN VALID. | |
T12PRE0023 | Plan ck | 02/28/2012 | N/A | NEIGHBORHOOD NOTIFICATION |