Inspection Status: Completed

Inspection History: COT - FOPR - Fire General Inspection

Case Number - _D7E30C645F8D3

Inspection Description - COT - FOPR - Fire General Inspection

Inspection Status - Completed

Date Description Inspector Results Comments
06/10/2014 COT - FOPR - Fire General Inspection Completed 20,000 gallon Diesel AST installed, piping and tank approved for use.
05/28/2014 COT - FOPR - Fire General Inspection Completed 3- 2500 gallon generator belly tanks approved for filling and start up. The two AST's on the system are not approved for use and required an approved set of plans.
11/20/2013 COT - FOPR - Fire General Inspection Completed 20,000 gallon AST installed without permits. Stop work ordered. 11.20.13 CJF