Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 13216600A


Addresses:

4004 S PARK AV


Inspection Status: Completed

Inspection History: COT - FCOD - Fire Re-inspection

Case Number - _2E0BFAC6759CA

Inspection Description - COT - FCOD - Fire Re-inspection

Inspection Status - Completed

Date Description Inspector Results Comments
08/30/2013 COT - FCOD - Fire Re-inspection Completed _ES BLDG. 6.
02/19/2013 COT - FCOD - Fire Re-inspection Completed _General services buildings (11)
04/18/2013 COT - FCOD - Fire Re-inspection Completed _Fleet services division (8)


All items abated. Last item, high expense, abated 3/19/13.
03/19/2013 COT - FCOD - Fire Re-inspection Completed _SAMM City Surplus.
12/04/2012 COT - FCOD - Fire Re-inspection Completed _ES Bldg. #2, Engineering/Tech assist.
11/06/2012 COT - FCOD - Fire Re-inspection Completed _ES Building #6.
12/12/2019 COT - FCOD - Fire Re-inspection Completed Closed as of 12.12.19 inspection.
01/22/2019 COT - FCOD - Fire Re-inspection Completed
03/21/2017 COT - FCOD - Fire Re-inspection Completed
03/21/2017 COT - FCOD - Fire Re-inspection Completed
03/21/2017 COT - FCOD - Fire Re-inspection Completed 3/21/17 ML - Left message with Ron Ravago to have portable fire extinguisher mounted at fuel island. It is currently sitting on the ground next ot the NW pillar.
3/21/17 ML - A work order is being generated to mount fire extinguisher per Ron Ravago of Central Safety.
01/06/2017 COT - FCOD - Fire Re-inspection Completed 1/6/17 ML - Per Ron Ravago, Central Safety will follow up on warning labels for electrical panels.
01/06/2017 COT - FCOD - Fire Re-inspection Completed 1/6/17 ML - Per Ron Ravago, Central Safety will follow up on warning labels for electrical panels.
12/19/2013 COT - FCOD - Fire Re-inspection Completed _ES Bldg. #1, Administration.
09/29/2015 COT - FCOD - Fire Re-inspection Completed JH 9/29/15 see attached paperwork on passed pressure tests.
12/22/2015 COT - FCOD - Fire Re-inspection Completed
09/22/2015 COT - FCOD - Fire Re-inspection Completed
05/21/2014 COT - FCOD - Fire Re-inspection Completed Met again with Mr. Molina. He had two sets of updated keys for both lockboxes. Both lockboxes now have updated keys and keycard.
05/21/2014 COT - FCOD - Fire Re-inspection Completed Met with lockshop supervisor Mike Molina. 240-1309, cell 850-5609. He is going to make a second set of keys for Ajo lockbox. He is also going to add a master key for some other buildings on-site. Will call back when ready to install keys.
10/21/2014 COT - FCOD - Fire Re-inspection Completed _MAITS Reinspection. TPD Comm.
03/11/2014 COT - FCOD - Fire Re-inspection Completed Abated. BC 3/4
03/11/2014 COT - FCOD - Fire Re-inspection Completed Abated. BC 3/4
03/11/2014 COT - FCOD - Fire Re-inspection Completed Abated. Corrales
03/11/2014 COT - FCOD - Fire Re-inspection Completed Abated. 3/4 Corrales.
05/04/2012 COT - FCOD - Fire Re-inspection Completed
03/11/2014 COT - FCOD - Fire Re-inspection Completed _Fleet fueling.

Abated. BC 3/11
03/11/2014 COT - FCOD - Fire Re-inspection Completed _Bldg. #3 Tech Insp.

Abated. BC 3/4
01/07/2014 COT - FCOD - Fire Re-inspection Completed _COT IT Warehouse #2.
11/14/2013 COT - FCOD - Fire Re-inspection Completed Streets surveyor's bldg.
11/14/2013 COT - FCOD - Fire Re-inspection Completed Streets materials lab.
11/14/2013 COT - FCOD - Fire Re-inspection Completed Streets sign shop.
11/14/2013 COT - FCOD - Fire Re-inspection Completed Streets Electrical Shop.
11/14/2013 COT - FCOD - Fire Re-inspection Completed Streets bldg. #14
10/01/2013 COT - FCOD - Fire Re-inspection Completed TFD BLDG #8.
10/01/2013 COT - FCOD - Fire Re-inspection Completed TFD Communications.
10/21/2011 COT - FCOD - Fire Re-inspection Completed MAITS re-inspection of bldg. #8.