Inspection Status: In Field Accepted

Inspection History: TWPE Daily Field Inspection

Date Description Inspector Results Comments
09/17/2026 TWPE Daily Field Inspection In Field Accepted No water work done today due to rainfall.
09/18/2026 TWPE Daily Field Inspection In Field Accepted Contractor installed hydrant and anode with DIP and 10’ PVC FOR DVA
09/21/2026 TWPE Daily Field Inspection In Field Accepted excavation area is ready for backfill
09/23/2026 TWPE Daily Field Inspection In Field Accepted Will set up pre pressure test and 2 hour 200 psi test with contractor.
09/28/2026 TWPE Daily Field Inspection In Field Accepted No Water work done today.
09/30/2026 TWPE Daily Field Inspection In Field Accepted No water work done today due to wet conditions.
10/01/2026 TWPE Daily Field Inspection In Field Accepted No water work done by contractor.
10/12/2026 TWPE Daily Field Inspection In Field Accepted Bac T sample collected for lab.
10/14/2026 TWPE Daily Field Inspection In Field Accepted Check high residual 24 hour after 100 ppm on 10/13/26. Still above 80 ppm. Flush line and check for low residual. below 10 ppm. Collected sample @ 12:15 pm and take to lab at Hayden Udall. Relinquish to lab @ 1:10 pm 10/14/26.
10/16/2026 TWPE Daily Field Inspection In Field Accepted
10/20/2026 TWPE Daily Field Inspection In Field Accepted No water work performed
10/22/2026 TWPE Daily Field Inspection In Field Accepted Contractor is on site to cut risers and place service boxes with valve covers.
10/23/2026 TWPE Daily Field Inspection In Field Accepted Contractor continued to cut valve risers and place valve covers for concrete collar and set service boxes.
TWPE Daily Field Inspection Scheduled