Inspection History Details
Inspection Status: In Field Accepted
Inspection History: TWPE Daily Field Inspection
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 05/08/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 05/13/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 05/15/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 05/28/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/02/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/03/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/04/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/09/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/10/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/12/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/16/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/18/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/24/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/25/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 06/29/2026 | TWPE Daily Field Inspection | In Field Accepted | I met with Dustin and Mario this morning. Fernando and his crew will not be in today. Mario will install the, 8X8 cross two 8X6 reducer (E, W) two 6X8 GV (E, W) 8 inch GV (N). sheet 12 of 21 note 4 sheet 8 of 21 note 1 Short easy day for Borderland. |
|
| 07/01/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 07/06/2026 | TWPE Daily Field Inspection | In Field Accepted | There were 3 crews installing pipe, Robbie’s crew installed 60 LF on Santa Clara Arles crew installed 80 LF Calle Casas Linda’s Mario’s crew installed 100 LF Calle Casas Linda’s |
|
| 07/09/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| 07/10/2026 | TWPE Daily Field Inspection | In Field Accepted | I met with Fernando this morning. He will have a crew working on prep work for paving, he stated he would get Santa Clara paved today. Arles with Hunter will continue DI pipe on Pacheco heading towards Valencia. Mario did not have a crew working today. | |
| 07/14/2026 | TWPE Daily Field Inspection | In Field Accepted | I met with Arles this morning, he will have a crew installing the FH on S Pacheco Ave at sta 13+77.91 sheet 13 of 21 note 7.2 I also spoke to Robbie this morning, he will the “pot hole” truck on site to verify the existing 4 inch CA location (FN 2326) once found Robbie will begin pipe placement on W Calle de Casas Lindas heading WB, sheet 13 of 21. |
|
| 07/15/2026 | TWPE Daily Field Inspection | In Field Accepted | I met with Arles this morning he will start the day with the vac truck in an effort to find the existing 4 inch CA (FN 2326) at approx sta 15+60 sheet 13 of 21. Once they find the ML the crew will continue installing DI pipe on Pacheco working NB towards Valencia Robbie will continue installing DI pipe on Casas Lindas start at sta 27+00 sheet 8 of 21 working WB towards Santa Clara. |
|
| 07/16/2026 | TWPE Daily Field Inspection | In Field Accepted | I met with Fernando this morning, Hunter will have two crews working on pipe placement on W Calle de Casas Lindas. Robbie with Hunter will start installing pipe east of S Santa Clara at sta 26+50 sheet 8 of 21 Mario with Hunter will have his crew start installing pipe west of S Santa Clara Ave at approx sta 15+20 sheet 7 of 21 Both crews installed 140 LF each of 6 inch DI pipe per SD-115 sheet 1 of 1. These were straight runs of pipe, no valves or fittings were installed today. |
|
| 07/21/2026 | TWPE Daily Field Inspection | In Field Accepted | I met with Arles this morning, he will have his crew start placing 6 inch DI pipe at sta 16+00 on S Pacheco Ave working NB. The crew will also 8X8 tee, 8 inch blind flange (facing north), 8X6 reducer (S), and the 6 inch GV (S). sheet 13 of 21 note 6. Arles also installed the ARV at approx sta 16+20. There is a blunder by HDR, plans state only one ARV, however Hunter will be installing 2, one at sta 13+88.22 and one at approx sta 16+20 sheet 13 of 21 note 9 only states “ 1 each” ARV. I met with Robbie, he will have his crew working on WS, The crew placing the “ saddle”, corporation stop at a 45 degree angle, and the 1 inch copper to the proposed meter box location. Addresses; 702, 710, 718 W Calle de Casas Lindas. I met with Mario, he will have his crew working on WS as well. Mario will start the day at the intersection of W Calle de Casas Lindas and S Pinta Ave. Addresses worked on; 950, 942, 934 W Calle de Casas Lindas. |
|
| 07/22/2026 | TWPE Daily Field Inspection | In Field Accepted | I met with Arles this morning, he will have his crew start placing 8 inch DI working down station on W Valencia Rd. (frontage rd) at sta 27+40. The crew placed 140 LF ending the day at sta 26+00 sheet 6 of 21 Robbie will have his crew working on WS. The crew worked on addresses; 726, 733, 734 W Calle de Casas Lindas Mario will also have his crew working on WS, addresses worked on; 927, 918, 919 W Calle de Casas Lindas. |
|
| 07/30/2026 | TWPE Daily Field Inspection | In Field Accepted | ||
| TWPE Daily Field Inspection | Scheduled |