Permit: TW-CONS-0326-0005

Parcel: 13805045C


Addresses:

6425 S PACHECO AV

Inspection Status: In Field Accepted

Inspection History: TWPE Summary review of Daily Field Inspections

Date Description Inspector Results Comments
05/05/2026 TWPE Summary review of Daily Field Inspections In Field Accepted
05/06/2026 TWPE Summary review of Daily Field Inspections In Field Accepted
05/13/2026 TWPE Summary review of Daily Field Inspections In Field Accepted
05/28/2026 TWPE Summary review of Daily Field Inspections In Field Accepted
06/04/2026 TWPE Summary review of Daily Field Inspections In Field Accepted
06/11/2026 TWPE Summary review of Daily Field Inspections In Field Accepted Tricon has completed all ML placement, and removals. Tricon has brought in a sub contractor to complete the concrete for TW meters.
06/29/2026 TWPE Summary review of Daily Field Inspections In Field Accepted I met with Chris Frost this morning. he advised me that the crew will complete one WS private plumbing and will leave by 12:00 pm. Happy Fourth of July
07/16/2026 TWPE Summary review of Daily Field Inspections In Field Accepted
07/30/2026 TWPE Summary review of Daily Field Inspections In Field Accepted this project is complete and final
08/26/2026 TWPE Summary review of Daily Field Inspections In Field Accepted I met with Chris Alzinger this morning, he will have the crew begin to install 8 inch DI pipe starting at approx sta 20+68. The crew will install the 8X6 tee and the 6 inch valve for FH at sta 20+68.06 sheet 11 of 17. The crew installed 140 LF.
09/02/2026 TWPE Summary review of Daily Field Inspections In Field Accepted this project is complete
10/19/2026 TWPE Summary review of Daily Field Inspections In Field Accepted
TWPE Summary review of Daily Field Inspections Scheduled