Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TW-CONS-0326-0005

Parcel: 13805045C


Addresses:

6425 S PACHECO AV

Inspection Status: In Field Accepted

Inspection History: TWPE Daily Field Inspection

Date Description Inspector Results Comments
05/05/2026 TWPE Daily Field Inspection In Field Accepted
05/07/2026 TWPE Daily Field Inspection In Field Accepted
06/02/2026 TWPE Daily Field Inspection In Field Accepted
06/04/2026 TWPE Daily Field Inspection In Field Accepted
06/08/2026 TWPE Daily Field Inspection In Field Accepted
06/12/2026 TWPE Daily Field Inspection In Field Accepted
06/16/2026 TWPE Daily Field Inspection In Field Accepted Tricon has a subcontract for all the concrete work around the meter boxes. After that Tricon will be done with this project. I have submitted the last pay app.
07/30/2026 TWPE Daily Field Inspection Not Applicable this project is complete and final
08/03/2026 TWPE Daily Field Inspection In Field Accepted Tricon has not started work yet.
08/25/2026 TWPE Daily Field Inspection In Field Accepted
08/27/2026 TWPE Daily Field Inspection In Field Accepted I met with Chris Alzinger this morning, he will start installing pipe at approx sta 20+55 and will work SB. The crew installed the 8X6 tee and the 8 inch GV at sta 20+30.43 note 8, the crew also installed the 8X6 tee, 8 inchGV, and the 6 inch GV at sta 19+77.32 note 7.1 sheet 11 of 17. Tricon is off to a good start!
08/31/2026 TWPE Daily Field Inspection In Field Accepted No work, contractors got rained out
09/01/2026 TWPE Daily Field Inspection In Field Accepted I met with Chris Alzinger this morning, he will have the crew begin working placing DI pipe EB on Hatfield St from Santa Clara. The crew installed 100 LF.

TW and Tricon had a small meeting today about a conflict with the FH on Hatfield St. We may have to put the FH out of service for approx 2 months. TW will notify TFD and hopefully we could shut down and complete the removals in this same area all at once saving time and money.
09/02/2026 TWPE Daily Field Inspection In Field Accepted I met with Chris Alzinger today, he will have the crew continue installing DI pipe on Hatfield St. working EB. It was kind of a slow day , or should I say “ uneventful “. The crew installed 100 LF today ….. moving along smoothly.
09/03/2026 TWPE Daily Field Inspection In Field Accepted I met with Chris Alzinger this morning morning , he will continue placing pipe on Hatfield Rd working EB
10/05/2026 TWPE Daily Field Inspection In Field Accepted I spoke to Chris Alzinger this morning. The crew will be pulled from this project and will be working on an emergency job at Valencia and Tucson Blvd
10/13/2026 TWPE Daily Field Inspection In Field Accepted project is complete
10/14/2026 TWPE Daily Field Inspection In Field Accepted this project is complete
10/15/2026 TWPE Daily Field Inspection In Field Accepted this project is complete
10/19/2026 TWPE Daily Field Inspection In Field Accepted this project is complete
10/20/2026 TWPE Daily Field Inspection In Field Accepted this project is complete
10/27/2026 TWPE Daily Field Inspection In Field Accepted
11/06/2026 TWPE Daily Field Inspection In Field Accepted this project is complete
TWPE Daily Field Inspection Scheduled