Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - SIGN - Sign Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | COT - SIGN - Sign Final | Not Ready | Client does not plan on connecting power to sign. Per the plan review team, a revision will be required to eliminate the electrical connection. |