Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - ENGR - Sign Footing and Excavation
Permit Number - TS-PRM-1223-00635
Inspection Description - COT - ENGR - Sign Footing and Excavation
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2024 | COT - ENGR - Sign Footing and Excavation | Partial Pass | Viewed (5) footer locations thru out drive thru area (4) footings at a depth of 48” and (1) at 30” all conduit for electrical is present, a sixth footer is remaining and will be called in next week for inspection. | |
02/12/2024 | COT - ENGR - Sign Footing and Excavation | Not Ready | Contractor called me this morning and informed me that they’re not ready for inspection and will reschedule at another time. | |
02/14/2024 | COT - ENGR - Sign Footing and Excavation | Passed | Footer (6) located at center of drive thru located on west side of building 48” depth by 30” all #4 rebar present and bolts formed and set at elevation for sign base, ready for concrete. |