Inspection Status: Partial Pass
Inspection History: COT - ENGR - Sign Footing and Excavation
| Date |
Description |
Inspector |
Results |
Comments |
| 01/31/2024 |
COT - ENGR - Sign Footing and Excavation |
|
Partial Pass |
Viewed (5) footer locations thru out drive thru area (4) footings at a depth of 48” and (1) at 30” all conduit for electrical is present, a sixth footer is remaining and will be called in next week for inspection. |
| 02/12/2024 |
COT - ENGR - Sign Footing and Excavation |
|
Not Ready |
Contractor called me this morning and informed me that they’re not ready for inspection and will reschedule at another time. |
| 02/14/2024 |
COT - ENGR - Sign Footing and Excavation |
|
Passed |
Footer (6) located at center of drive thru located on west side of building 48” depth by 30” all #4 rebar present and bolts formed and set at elevation for sign base, ready for concrete. |