Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2026 | COT - ENGR - Sign Electrical | Not Ready | Signage permit requires visible power disconnect switch, UL sticker and manufacturer sticker.(Fusion Signs is the manufacturer and Installer no need for installer sticker) : N1 complies N2 needs manufacturers sticker N3 needs manufacturer sticker N4 is covered with plastic, So I cannot verify Power disconnect switch manufacturer sticker, and UL sticker. N5 complies/ not illuminated N6 needs manufacturer sticker, power disconnect, switch underneath cover plate. N7 complies. Dedicated circuits are clearly labeled in Panel A. Set Timer for signs correctly. Timer must override any other sign illumination controls. Timer needs permanent sign turn off notice inside door of timer with Outdoor Lighting Code language provided on Page 5 of Permit in Yellow box. When Ready schedule sign Electrical and Sign Final. |
|
| 05/14/2026 | COT - ENGR - Sign Electrical | Passed | All Illuminated signs now comply. |