Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - ENGR - Sign Drilled-Pier
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2026 | COT - ENGR - Sign Drilled-Pier | Partial Pass | Sign 'A' footing excavation (Campbell frontage) is good, okay to pour. Sign 'B' footing excavation (Ft. Lowell frontage) location does not match plans, is farther East than shown on plans. Not approved to pour. |
|
| 02/26/2026 | COT - ENGR - Sign Drilled-Pier | Partial Pass | Sign 'B' revised new location is pending approval. Ensure that leading face of sign has a minimum of 10 foot setback from the face of curb on Fort Lowell Rd. Current location of footing for directional sign ‘B’ is accurate to the submitted revision. Prior to revised plans receiving approval, any work done is ‘at risk’. |