Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - SIGN - Sign Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - SIGN - Sign Final | Not Ready | Dedicated circuit needs to be labeled for sign. | ||
| 05/22/2025 | COT - SIGN - Sign Final | Passed |