Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
Permit Number - TS-PRM-1024-00436
Inspection Description - COT - ENGR - Sign Electrical
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | COT - ENGR - Sign Electrical | Not Ready | Need a disconnect switch on the new Giant sign. Also ensure UL label and installer label is visibly seen from ground. Also all lit building and monument signs need to be on a timer clock. | |
| 03/25/2025 | COT - ENGR - Sign Electrical | Partial Pass | All items listed have been completed other than the timer. Timer is on the owners side so this partial pass will release the sign contractor. |