Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2026 | COT - ENGR - Sign Electrical | Not Ready | -No clearly labeled circuit for wall sign/s in electrical panel. -There is a timer next to panel but it refers to circuit 19 inside door in panel that is labeled lights. - no power diconnect To pass electrical Final I will need to verify that there is labeled circuit that feeds sign, a timer set to comply with Tucson outdoor lighting code and a picture of the power disconnect behind sign per plan. None of these items are visible to me. |