Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCEL - Outdoor Lighting
Permit Number - TS-PRM-0725-00316
Inspection Description - COT - HCEL - Outdoor Lighting
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2025 | COT - HCEL - Outdoor Lighting | Not Ready | 11/24/25 - Sign Electrical inspection will need a dedicated sign circuit breaker, a timer set to turn off signs at midnight or close of business, whichever is later, a disconnect switch that is either in line of sight or lockable. Signage Final inspection will require UL labels, installer & manufacturer label, proper placement, and correct size of installed sign. |
|
| 11/26/2025 | COT - HCEL - Outdoor Lighting | Passed |