Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2026 | COT - ENGR - Sign Electrical | Not Ready | 3/24/26 Wall sign has no dedicated labeled circuit. Timer is near electrical panel but is not set correct to the permit. Monument Sign is not energized. No circuit for LED element or illuminated copy. No timer for monument sign.. |
|
| 07/27/2026 | COT - ENGR - Sign Electrical | Passed | Wall sign and monument sign circuits clearly labeled.. Timer is near electrical panel and set correct to outdoor lighting code. Power disconnects on signs. |