Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/31/2026 |
COT - ENGR - Signage Final |
|
Not Ready |
Sign Electrical needs to pass for Final. All items are correct except no power disconnect visible on sign. Provide picture of disconnect and reschedule sign electrical and final inspections |