Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2024 | COT - ENGR - Signage Final | Not Ready | Each sign needs to have a disconnect switch visible on the sign and, each one needs a UL listing label and the installer label. |