Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2026 | COT - ENGR - Sign Electrical | Not Ready | Not able to verify power disconnects on any of the transformer box of any signs A1,A2 and B-E. I was able to find correctly labeled circuits for B-E inside Kiosk, but no timer for these signs. Timer may be behind "maintainance disconnect" door top right of same panel but it was locked-or signs may bee controlled remotely. I need to verify it complies with Outdoor Lighting Code. I was also able to find correctly labeled circuits for sign A1 and A2 in subpanel LF located up the stairs by front entry way but again no timer. I was able to see manufacturers/installer sticker, and UL listing stickers on all signs for electrical final |
|
| 06/01/2026 | COT - ENGR - Sign Electrical | Passed | 6/1/26 - Necessary equipment for electrical requirements have been verified. Signs are installed in accordance with approved plans. |