Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/2025 |
COT - ENGR - Sign Electrical |
|
Not Ready |
Sign has dedicated circuit. Sign does not have Safety lockout. There is not a programmed labeled timer nearby the power supply. |
| 07/13/2026 |
COT - ENGR - Sign Electrical |
|
Not Ready |
Timer to control sign lighting has not been installed yet. Contractor on site is going to take care of it and provide photos once complete. |