Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Footing and Excavation
Permit Number - TS-PRM-0324-00100
Inspection Description - COT - ENGR - Sign Footing and Excavation
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2025 | COT - ENGR - Sign Footing and Excavation | Not Ready | These signs are not newly installed and have been in place sense before QT opened. We will now need an engineers letter to cover this installation as special requirements were needed. | |
| 02/27/2025 | COT - ENGR - Sign Footing and Excavation | Passed | ||
| 08/09/2024 | COT - ENGR - Sign Footing and Excavation | Not Ready | The Permit was not left on-site and the Contractor did not call back when called. Reschedule these Inspections at a later date when the Permit or Contractor can be available on site. | |
| 08/16/2024 | COT - ENGR - Sign Footing and Excavation | Partial Pass | The contractor will provide photographs of the foundations prior to being approved |