Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Footing and Excavation
Permit Number - TS-PRM-0324-00095
Inspection Description - COT - ENGR - Sign Footing and Excavation
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2024 | COT - ENGR - Sign Footing and Excavation | Not Ready | 1) There is an existing irrigation line that has been repaired within the caisson, this line needs to be relocated from within the foundation area. 2 The boring for the column caisson is not straight, the boring hole shifted during the process. 3) The depth of the footer is less than 6 feet to the loose soil inside the caisson, all loose soil should be removed prior to the next scheduled inspection. |
|
05/13/2024 | COT - ENGR - Sign Footing and Excavation | Passed |