Inspection Status: Not Ready

Inspection History: COT - ENGR - Signage Final

Date Description Inspector Results Comments
04/29/2026 COT - ENGR - Signage Final Not Ready Awning attachments do not match approved plans - threaded rods not used, inside attachment points not visible. Confirmation of attachment bolts must be provided or third party inspection to verify install.
04/30/2026 COT - ENGR - Signage Final Passed Awning is installed in accordance with approved plans.