Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Sign Attachments
| Date |
Description |
Inspector |
Results |
Comments |
| 04/29/2026 |
PDSD Site/Engineering Division - Sign Attachments |
|
Not Ready |
Awning attachments do not match approved plans - threaded rods not used, inside attachment points not visible. Confirmation of attachment bolts must be provided or third party inspection to verify install. |
| 04/30/2026 |
PDSD Site/Engineering Division - Sign Attachments |
|
Passed |
Awning is installed in accordance with approved plans. |