Inspection Status: Not Ready

Inspection History: COT - ENGR - Signage Final

Date Description Inspector Results Comments
03/24/2026 COT - ENGR - Signage Final Not Ready No sign lighting timer present on site - need verification of shutoff time. Sign location is incorrect on permit, needs to be revised to reflect north face of building installation location. UL labels and disconnect are present.