Inspection Status: Not Ready
Inspection History: COT - ENGR - Sign Electrical
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2026 |
COT - ENGR - Sign Electrical |
|
Not Ready |
No sign lighting timer present on site - need verification of shutoff time. Sign location is incorrect on permit, needs to be revised to reflect north face of building installation location. UL labels and disconnect are present |