Inspection Status: Not Ready

Inspection History: COT - ENGR - Signage Final

Permit Number - TS-PRM-0125-00039

Inspection Description - COT - ENGR - Signage Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
05/20/2025 COT - ENGR - Signage Final Not Ready Address Electrical Final; UL sticker and manufacturer labels are in place.
07/29/2025 COT - ENGR - Signage Final Failed A dedicated disconnect switch must be installed (if in a separate location from the sign, must be lockable). A lighting timer must be installed to shut off the signs no later than close of business or 12:00 am. Unable to locate the disconnect and timer.
09/05/2025 COT - ENGR - Signage Final Passed Signs are installed in accordance with approved plans.