Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2025 |
COT - ENGR - Signage Final |
|
Not Ready |
Address Electrical Final; UL sticker and manufacturer labels are in place. |
| 07/29/2025 |
COT - ENGR - Signage Final |
|
Failed |
A dedicated disconnect switch must be installed (if in a separate location from the sign, must be lockable). A lighting timer must be installed to shut off the signs no later than close of business or 12:00 am. Unable to locate the disconnect and timer. |
| 09/05/2025 |
COT - ENGR - Signage Final |
|
Passed |
Signs are installed in accordance with approved plans. |