Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/08/2025 |
COT - ENGR - Signage Final |
|
Not Ready |
Sign Final can’t be completed without passing sign electrical inspection. |
| 10/20/2025 |
COT - ENGR - Signage Final |
|
Not Ready |
Revise permit to accurately reflect conditions. Permit states a Timer and circuit will be installed. Remove these comments and have owner apply for a separate electrical permit to address requirements. |
| 10/23/2025 |
COT - ENGR - Signage Final |
|
Not Ready |
Recall this inspection after plan revision is approved |