Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2026 | TRSP - ROW - Final | Re-inspection required | Underground work is complete and temporary patch is in place. A final pavement repair will be required before permit can be closed |