Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final
Permit Number - TR-UTL-0825-01264
Inspection Description - TRSP - ROW - Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2025 | TRSP - ROW - Final | Re-inspection required | Work is complete but we’re still waiting on a final payment repair | |
| 11/05/2025 | TRSP - ROW - Final | Re-inspection required | Temporary patches in please. Still waiting on permanent pavement repair. |