Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: TRSP - ROW - Barricade - Setup/Routine
| Date |
Description |
Inspector |
Results |
Comments |
| 01/15/2026 |
TRSP - ROW - Barricade - Setup/Routine |
|
Passed |
|
| 02/04/2026 |
TRSP - ROW - Barricade - Setup/Routine |
|
Passed |
Notice of change to their traffic control. They are going to be doing a set up for flaggers and they have to cross the street going into Warren with the new 8 inch steel and a 4 inch plastic sleeve to create a loop. They will be uploading the new traffic control change to the existing permit. |
| 08/27/2025 |
TRSP - ROW - Barricade - Setup/Routine |
|
Passed |
|
| 09/19/2025 |
TRSP - ROW - Barricade - Setup/Routine |
|
Passed |
|
| 09/19/2025 |
TRSP - ROW - Barricade - Setup/Routine |
|
Passed |
This inspection was set up for a complaint or future complaint that if it happens to come up in the 311 complaint system, I will reiterate what happened |
| 10/10/2025 |
TRSP - ROW - Barricade - Setup/Routine |
|
Re-inspection required |
|
| 10/21/2025 |
TRSP - ROW - Barricade - Setup/Routine |
|
Re-inspection required |
|
| 11/05/2025 |
TRSP - ROW - Barricade - Setup/Routine |
|
Passed |
|