Permit: TR-UTL-0625-00903

Parcel: 115024860


Addresses:

1485 N 3RD AV

Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Final

Date Description Inspector Results Comments
04/28/2026 TRSP - ROW - Final Re-inspection required asphalt patch has not been installed
05/21/2026 TRSP - ROW - Final Re-inspection required temporary patch is currently in place. T top style permanent patch, spanning entire width of lane affected, will be needed for final approval.
07/13/2026 TRSP - ROW - Final Re-inspection required work order 3036334, 1485 n 3rd av 14-13-01 se, replace leaking hydrant north of the lot in dirt, 8lf. ca still needs permanent asphalt patch
07/14/2025 TRSP - ROW - Final Re-inspection required
08/18/2026 TRSP - ROW - Final Passed Permanent patch has not been installed prior to the 411 still has a temp patch in there