Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final/Close-Out
| Date |
Description |
Inspector |
Results |
Comments |
| 04/14/2026 |
TRSP - ROW - Final/Close-Out |
|
Re-inspection required |
Concrete sidewalk still needs to be repaired, cold mix is still being used. |
| 07/17/2025 |
TRSP - ROW - Final/Close-Out |
|
Re-inspection required |
|