Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/25/2025 |
TRSP - ROW - Final |
|
Re-inspection required |
Final moratorium patch has not been completed |
| 04/21/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
Temporary patch in place, full pavement repair required for final inspection to pass. Road falls under moratorium status |
| 06/10/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
Waiting on permanent pavement repair, road falls under moratorium. |
| 07/06/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
Temporary patch in place, final moratorium patch will be required before final inspection can be passed. |
| 08/07/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
An email was sent to Tucson Water in early July and a work order was generated. The site has now been saw cut with locates painted out. The new patch is very close to being completed. |
| 09/22/2026 |
TRSP - ROW - Final |
|
Passed |
Work has now been completed with a final moratorium pavement patch. |