Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/30/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
1/29/26- 90 day renewal as of 1/30/26. New expiration is 4/30/26 |
| 04/28/2026 |
TRSP - ROW - Final |
|
Re-inspection required |
The underground work appears to be complete and temporary patches are in place over the trenches, but permanent pavement repair will be required before final inspection can be passed. The trenches have all been saw cut so it appears that final pavement repair will be soon. |
| 06/15/2026 |
TRSP - ROW - Final |
|
Passed |
Work is now complete. |