Inspection History Details
Inspection Status: Failed
Inspection History: TRSP - ROW - Final/Close-Out
Permit Number - TR-ROW-0524-00580
Inspection Description - TRSP - ROW - Final/Close-Out
Inspection Status - Failed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/03/2025 | TRSP - ROW - Final/Close-Out | Failed | pavement patch has failed and needs to be redone. This permit has expired so no work can be continued on this permit and a new permit needs to be applied for and issued. | |
06/19/2024 | TRSP - ROW - Final/Close-Out | Re-inspection required | asphalt restoration nand surface treatment needed. appears Tucson water also did work. contractor in reachable I left a message. |