Inspection Status: Passed
Inspection History: TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2026 |
TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting |
|
Passed |
Notify the school they are going to be done with the side on the 13th St. side before school graduation and have it cleaned up before the 20th if there are any hiccups, they will not start that side until after graduation Right away script read and understood contractor will contact us if there any changes to their schedule line or any hiccups or questions Zack Sahlberg 520-753-8852 Carlos Moreno 520-304-6895 are the contact points for Durozo construction the goal is to have everything completed for the entire area before July 6 when the 411 comes through notified Gabe Rascon during the pre-con to confirm this date |