Inspection History Details
Inspection Status: Deferred
Inspection History: TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour)
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Deferred | COT Electric Shop inspecting this portion of project |