Inspection Status: Passed

Inspection History: TRSP - ROW - Barricade - Setup/Routine

Date Description Inspector Results Comments
05/12/2026 TRSP - ROW - Barricade - Setup/Routine Passed No work has begun at the intersection of Trotter sisters and Colossal caves. There are locates painted and right of way has been staked, but no traffic control setup yet.
05/21/2026 TRSP - ROW - Barricade - Setup/Routine Passed Site check of the area and no work has begun and no traffic control has been set up.
05/28/2026 TRSP - ROW - Barricade - Setup/Routine Passed No work has started on this project yet
06/04/2026 TRSP - ROW - Barricade - Setup/Routine Passed No work on site yet. No traffic control on site yet. Some locates have been completed.
06/10/2026 TRSP - ROW - Barricade - Setup/Routine Passed No work on site, no traffic control set up.
06/16/2026 TRSP - ROW - Barricade - Setup/Routine Passed Work has not started on site yet.
06/22/2026 TRSP - ROW - Barricade - Setup/Routine Passed No work on site. After a phone call with the contractor it was determined that this permit would be allowed to expire and a new permit will be acquired several months down the road when the contractor can start the project.