Inspection Status: Re-inspection required

Inspection History: TRSP - ROW - Final

Date Description Inspector Results Comments
07/20/2026 TRSP - ROW - Final Re-inspection required Work still in progress need to renew extend or get new permit number with this permit attached to it spoke to contractor. They are standing polls and pulling line joint venture with TEP and Wapa first part of the phase entering Tucson at Sunset Boulevard going all the way to the new substation at flowing Wells between Glen and Grant. This will probably take another three months.