Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: TRSP - PIA - Roadway Subgrade

Date Description Inspector Results Comments
TRSP - PIA - Roadway Subgrade Passed I met on site with Shane from ATEK who collected a sample of native subgrade material for the lab. No demo within the roadway has occurred yet on this project.
TRSP - PIA - Roadway Subgrade Passed I received a phone call from Shawn at SMS construction who is doing work for the TEP substation on Flowing Wells on Monday, April 20. During the phone call, he informed me that they intended to pour the concrete pad on the east side of Flowing Wells tomorrow and would like for me to do a pre-pour inspection of the pad. My on-site inspection confirmed that the pad will be 6 inches thick with number four rebar reinforcement. I also spoke with Antonio who informed me that the pour will be at 9 AM and they ordered 50 yards of 3000 psi class S concrete.
04/21/2026 TRSP - PIA - Roadway Subgrade Passed 50 yards of 3000 psi class S concrete from Cal Portland was poured today for the eastern pad. The ticket was stamped 8:18 AM and truck arrived at 8:58 AM slump ordered was four truck arrived with slump 4 1/2 to 5. Product code is 130624. Sta 11+34.97 to Sta 12+36.19
08/11/2026 TRSP - PIA - Roadway Subgrade Deferred