Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: TRSP - PIA - Barricade - Setup/Takedown/Routine

Date Description Inspector Results Comments
03/09/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Traffic control is set up and work within. The right away has ceased. The curb forms are still up but no concrete has been poured and no demo of the road has occurred yet.
05/08/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Passed Site visit to TEP at flowing Wells. No work has begun on concrete pad on west side of flowing well yet. Stock piles have been moved farther south but other than that no changes within the right of way.
10/09/2026 TRSP - PIA - Barricade - Setup/Takedown/Routine Deferred