Inspection Status: Passed
Inspection History: TRSP - PIA - Barricade - Setup/Takedown/Routine
| Date |
Description |
Inspector |
Results |
Comments |
| 03/09/2026 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Traffic control is set up and work within. The right away has ceased. The curb forms are still up but no concrete has been poured and no demo of the road has occurred yet. |
| 05/08/2026 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Passed |
Site visit to TEP at flowing Wells. No work has begun on concrete pad on west side of flowing well yet. Stock piles have been moved farther south but other than that no changes within the right of way. |
| 10/09/2026 |
TRSP - PIA - Barricade - Setup/Takedown/Routine |
|
Deferred |
|