Inspection Status: Passed
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
| Date |
Description |
Inspector |
Results |
Comments |
| 08/25/2026 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
|
Passed |
A final walkthrough has been completed by both Dan and Jeremy. One item needed to be addressed and was corrected, the curb end transition was added to the curb terminus at the Northwest end of the project. All inspection have now been passed, |