Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
Permit Number - TR-PIA-0824-00011
Inspection Description - TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2025 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | Final inspection requires a few sidewalk panels and ADA ramp transition panel replacement due to damage by another trade. | |
| 10/21/2025 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | Final Re-inspection was done for broken sidewalk panels. They were re-poured, inspected, and passed. |