Inspection History Details
Inspection Status: Passed
Inspection History: TRSP - PIA - Sidewalk Placement
Permit Number - TR-PIA-0824-00011
Inspection Description - TRSP - PIA - Sidewalk Placement
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | TRSP - PIA - Sidewalk Placement | Passed | No PIA work being done on site yet. | |
| 07/01/2025 | TRSP - PIA - Sidewalk Placement | Passed | Concrete sidewalk pour was done at 7:30 AM. West side sidewalk and path south toward parking lot. | |
| 07/02/2025 | TRSP - PIA - Sidewalk Placement | Passed | Sidewalk on east side of tangential sidewalk heading south into business was poured between stations 11+25 & 12+50. | |
| 07/09/2025 | TRSP - PIA - Sidewalk Placement | Passed | CEMEX delivered concrete. Slump, visually, was at specified slump 4.5". ADA ramp and far east curb return were poured with same mix. | |
| 07/11/2025 | TRSP - PIA - Sidewalk Placement | Passed | CEMEX provided the mix for ADA ramp. Truncated domes were placed according to specifications and all slope percentage were within specs and standards. | |
| 07/14/2025 | TRSP - PIA - Sidewalk Placement | Passed | ADA ramp was poured utilizing approved mix from CEMEX. ADA slope percentages met standards and specs utilizing a smart level. Truncated domes were installed according to plans. Area was prepared by Day's Excavation; base was AB brought up on lifts using moisture and tamp vibrating plate. |