Inspection Status: Passed
Inspection History: TRSP - PIA - Sidewalk Placement
| Date |
Description |
Inspector |
Results |
Comments |
| 06/16/2025 |
TRSP - PIA - Sidewalk Placement |
|
Passed |
No PIA work being done on site yet. |
| 07/01/2025 |
TRSP - PIA - Sidewalk Placement |
|
Passed |
Concrete sidewalk pour was done at 7:30 AM. West side sidewalk and path south toward parking lot. |
| 07/02/2025 |
TRSP - PIA - Sidewalk Placement |
|
Passed |
Sidewalk on east side of tangential sidewalk heading south into business was poured between stations 11+25 & 12+50. |
| 07/09/2025 |
TRSP - PIA - Sidewalk Placement |
|
Passed |
CEMEX delivered concrete. Slump, visually, was at specified slump 4.5". ADA ramp and far east curb return were poured with same mix. |
| 07/11/2025 |
TRSP - PIA - Sidewalk Placement |
|
Passed |
CEMEX provided the mix for ADA ramp. Truncated domes were placed according to specifications and all slope percentage were within specs and standards. |
| 07/14/2025 |
TRSP - PIA - Sidewalk Placement |
|
Passed |
ADA ramp was poured utilizing approved mix from CEMEX. ADA slope percentages met standards and specs utilizing a smart level. Truncated domes were installed according to plans. Area was prepared by Day's Excavation; base was AB brought up on lifts using moisture and tamp vibrating plate. |